Trying to place bedding over utility conduits at a consistent depth in hard-to-reach locations is frustrating even to the best operator.
The ATP-20 not only saves you money by increasing production, but it also decreases the amount of gravel normally used. This is because the bedding material is placed in the right place the first time, resulting in a substantial labor savings as well.